Portfolio


Montargil Dam, Montargil

Gallery

Work. A.R.V.S. - Regantes do Vale do Sorraia Association, Montargil Dam
Client. A.R.V.S. - Regantes do Vale do Sorraia Association
Location. Montargil
Date. 2012
Work done. Resolution of infiltrations of groundwater in the access well to the Command gallery of the bottom discharge valves of the Montargil Dam, through sanitation and localized repair of structural reinforced concrete of the peripheral containment walls, fouling of fissures with occurrence of infiltrations, through injection molding of hydro-active resins based on polyurethane and by the application of capillary cementitious waterproofing agents

Social Market, Setúbal

Gallery

Work. Construction and Implementation of the Social Market, Bairro da Bela Vista, Setúbal
Client. Câmara Municipal de Setúbal
Location. Setúbal
Date. 2012
Work done. Completion of works to improve, repair and remodel existing commercial space, with a view to creating and implementing a Social Market, thus ensuring a new use of existing space, allowing the creation of new facilities such as a social laundry, a small repairs workshop, a space for training and other activities, as well as clothing, furniture and food stores to be distributed by the social support institutions in the Municipio of Setúbal

Church of the Hospital Sousa Martins, Guarda

Gallery

Work. Rehabilitation of the Church of the Hospital Sousa Martins, Guarda
Client. EDIFER / HAGEN
Location. Guarda
Date. 2011
Work done. Complete repair of the exterior of the church through injections of inorganic grouts into slits in the consolidation of the walls, repair of the lime-based mortar coverings, repair of roofs, eaves, cimalhas, cleaning, and waterproofing of stone masonry and decorative elements in granite stone, exterior paints, repair of stained glass, treatment and protection of wood in false ceilings, exterior spans.
Repair of the interior of the church, through the cleaning of decorative elements in masonry, including reclosing of joints, repair of spans, embellishment and varnishing of interior wooden floors, repair of interior decorative panels in tile, execution of punctual repairs of stucco ceilings, varnishing of ceilings in wood, repair and repainting of walls

Windmill of the "JIM", Barreiro

Gallery

Work. Rehabilitation of the "JIM" windmill, Barreiro
Client. Câmara Municipal do Barreiro
Location. Barreiro
Date. 2010/11
Work done. Rehabilitation of the "JIM" windmill, Barreiro

Herdade do Cação, Mértola

Gallery

Work. Construction of Silos, Herdade do Cação, Mértola
Client. GESTMIN SGPS, S.A.
Location. Mértola
Date. 2010/11
Work done. Construction of reinforced concrete silos for storage of cereal, with cover in metallic structure

Silopor S.A., Beato

Gallery

Work. Silopor S.A., Beato
Client. SILOPOR, Company of Silos Portuários, S.A.
Location. Lisboa
Date. 2010
Work done. Repair and painting of the main facade of the administrative building of the grain discharge terminal

SIEMENS, S.A., Sintra

Gallery

Work. SIEMENS, Fábrica de Transformadores, S.A., Sintra
Client. SIEMENS, S.A.
Location. Sabugo, Sintra
Date. 2010
Work done. Repair and structural reinforcement of the "Power Plant" of the Siemens Production building, through the application of metallic cladding and prestressed threaded bars in the "dogs" supporting the cranes and strapping of pillars with fabrics armed in carbon fibers

Luísa Todi Municipal Forum, Setúbal

Gallery

Work. Reforço Estrutural Fórum Municipal Luísa Todi, Setúbal
Client. TEODORO GOMES ALHO, S.A.
Location. Setúbal
Date. 2009/10
Work done. Reinforcement of foundations, repair of structural reinforced concrete, reinforcement of beams, pillars and slabs through bonding and screwing of steel sheets and profiles in concrete, blankets and laminates of carbon fibers (CFRP)

Barragem do Maranhão, Avis

Gallery

Work. Repair and reinforcement of the water discharge channel, Maranhão
Client. Regantes e Beneficiários do Vale do Sorraia Association
Location. Maranhão, Avis
Date. 2009/10
Work done. Study, design and implementation of the repair solution and reinforcement of the water discharge channel in the downstream section of the independent irrigation valve (VRI)